Generator excitation
 
    
                
        Turbogenerator excitation
Turbogenerator excitation is implemented according to the type of excitation system as one of the following solutions: AVR Safety, AVR Power, or AVR Compact. The AVR Z110 regulator is designed as a single-board module and includes thyristor phase control, programmable logic devices (PLDs), two ARM-based microcontrollers, and communication adapters for USB, RS232, and Ethernet.
The regulator's control panel is integrated into the cabinet door along with a keypad. The panel features several types of screens that provide complete information on the status of the excitation system and the generator’s measured values. It also includes control buttons for local excitation operation. A similar control panel is available for installation in the unit control room.
The turbogenerator excitation control system can be extended with a generator synchronizer, implemented using the DSD Z110 module, which is also a single-board design and includes analog measurement inputs, programmable logic devices, two ARM-based microcontrollers, and communication adapters for USB, RS485/422, and Ethernet.
The AVR Safety excitation regulator complies with Category C safety functions according to ČSN EN 61226 and is implemented on the SandRA platform. It is communication-connected to the Unit Control and Information System (UCIS).
Diesel generator excitation
Diesel generator excitation is implemented using the AVR Safety system.
The diesel generator is intended for emergency power supply to the primary circuit of the nuclear power plant. The excitation system ensures precise regulation of the generator stator voltage and other parameters related to generator control by adjusting the excitation current.
The system performs Category A safety functions according to ČSN EN 61226. It is implemented on the SandRA Z110 platform. The regulator is communication-connected to the Unit Control and Information System (UCIS).
The diesel generator excitation control system, supplied by ZAT a.s., can be designed and implemented according to customer requirements, either as a complete system replacement or as a partial retrofit of the excitation control section.
 
    
            
        Main functions of the voltage regulator:
- Voltage and reactive power regulation
- Voltage matching before synchronizing the generator to the grid
- Zero reactive power setting before disconnecting the generator from the grid
- Regulation of the excitation current during tests and loss of stator voltage measurement
- Inverter operation of a thyristor rectifier for operational excitation of the generator
- Stator and rotor current limiters
- Voltage limiter and U/f limiter
- Under-excitation limiter
- System stabilizer
- Generator phaser
- PLC controller, fault diagnostics, and automatic switching between channels
 
    
            
        Function of the synchronization device:
Automatic closing of the generator circuit breaker
Monitoring and control of closing
Important references
- 
            
                  21st kindergarten Na Celchu
- 
            
                  Hněvkovice hydroelectric structure
- 
            
                  Dispatcher control for LDS – Railway Administration
- 
            
                  Reconstruction of the station building at Plzeň hl. n.
- 
            
                  Reconstruction of the station building at České Budějovice hl. n.
- 
            
                  Pakš Nuclear Power Plant
- 
            
                  Research reactor and auxiliary technologies for the Institute of Nuclear Research "Řež"
- 
            
                  Dukovany Nuclear Power Plant
- 
            
                  Opatovice Power Plant
- 
            
                  Power plant Felton, Cuba
- 
            
                  Hydropower plant Gabčíkovo
- 
            
                  Liptovská Mara pumped storage hydropower plant
- 
            
                  Pilsen heating plant
- 
            
                  Hydroelectric power plant Lipno I
- 
            
                  Small hydropower plant Kořensko
- 
            
                  Mělník I Power Plant
- 
            
                  WWTP Mníšek pod Brdy
- 
            
                  Central distribution control room for GasNet
- 
            
                  Management and analysis of cathodic protection - Pražská plynárenská
- 
            
                  Emerson Climate Technologie
- 
            
                  Denso manufacturing Czech s.r.o.
- 
            
                  Project documentation for Štramberk UGS
- 
            
                  Continental Automotive CZ
- 
            
                  SAINT-GOBAIN, world leader in the building materials market
- 
            
                  Life card
- 
            
                  Modernisation of the biogas plant in Dobruška
- 
            
                  Biogas station Bzovík
- 
            
                  Starosedlský Hrádek biogas station with SandRA control system
- 
            
                  Mrákov biogas station with Siemens control system
- 
            
                  Elementary school "Masarykova" in Klatovy
- 
            
                  Alzheimer Center Roztoky
- 
            
                  Telemetry stations for GasNet s.r.o.
- 
            
                  Gas transfer station for the company EG.D
- 
            
                  Emergency depressurization - UGS Štramberk
- 
            
                  Landslide detection in Mosty u Jablunkova
- 
            
                  Landslide detection in Karlovy Vary
- 
            
                  Implementation of the I.P.P.E. Dýšiná technical control room
- 
            
                  "Ejpovice" Tunnel
- 
            
                  Dispatch centers of the regional directorates of the Railway Association
- 
            
                  Information system to support the sale of apartments, houses and plots
- 
            
                  SimONet helps to save energy in the FC Viktoria Plzeň academy building
- 
            
                  Gallery Klatovy / Klenová
- 
            
                  Health center in pocket
- 
            
                  Information system to support the sale of apartments, houses and plots
- 
            
                  Health at the click
- 
            
                  Electronics manufacturing for demanding industries
- 
            
                  Production of the SandRA control system
- 
            
                  Municipal water management Třeboň
- 
            
                  Heating plant Náchod
- 
            
                  Small incinerator Evecont - C-Energy Planá
- 
            
                  Loviisa Nuclear Power Plant
- 
            Enguri Hydroelectric Power PlantExcitation system replacement – TG2 Georgia, 2025 
- 
            Hydroelectric Power Plant Štěchovice – TG3Excitation migration of TG3 CZ, 2024 
- 
            10 excitation units at hydroelectric power plants – SlovakiaModernization of 10 excitation units Slovakia, 2024 
- 
            Kyzylorda Power PlantDelivery of turbine turning synchronization KAZ, 2024 
- 
            Chvaletice Power PlantDelivery of turbine turning synchronization CZ, 2024 
- 
            Golfech Nuclear Power PlantDelivery of KCF system (2x PWR 1330) France, 2024 
- 
            Gas transfer station HospozínControl system reconstruction CZ, 2023 
- 
            Opatovice Power PlantReplacement of control system and field instrumentation - TG3 CZ, 2023 
- 
            Plzeňská teplárenská - TGSDelivery of turbine turning synchronization CZ, 2023 
- 
            Jafurah Cogeneration Power PlantDelivery of turbine turning synchronization SAE, 2023 
- 
            Tanajib Cogeneration Power PlantDelivery of 2 turbine turning synchronization systems SAE, 2023 
- 
            Temane Thermal Power PlantDelivery of turbine turning synchronization Mozambik, 2023 
- 
            Olefin chemical plantDelivery of 2 turbine turning synchronization systems Polsko, 2023 
- 
            Waterworks LipnoModernization of the control system on the SandRA platform CZ, 2022 
- 
            Custom productionProduction of 140 pieces of a medical device for a customer CZ, 2022 
- 
            Gas transfer control station MakotřasyControl system reconstruction CZ, 2022 
- 
            Slough waste incineration plantDelivery of turbine turning synchronization Velká Británie, 2022 
- 
            Belleville Nuclear Power PlantDelivery of KCF system (2x PWR 1330) France, 2022 
- 
            Transfer control station KrupáControl system and boiler room reconstruction CZ, 2021 
- 
            Cathodic protection station Skalice nad SvitavouWireless measurement from cathodic protectors CZ, 2021 
- 
            Heating plant PříbramReconstruction of the boiler control system due to transition to another fuel CZ, 2021 
- 
            Heating plant in TaborMigration of the boiler control system in connection with fuel change CZ, 2021 
- 
            Biogas station Dlouhá LhotaSupply of control system and monitoring system with Simatic S7-300 PLC and Reliance visualization Czech Republic, 2021 
- 
            WWTP TuchloviceDelivery of Schneider control and monitoring system CZ, 2021 
- 
            Coal preparation LedviceDelivery of Siemens S7 1500 control system for coal conveyor belt control CZ, 2021 
- 
            Waterworks ŽilinaReconstruction of excitation controllers TG1 and TG2 SK, 2021 
- 
            Railway line Oldřichov u Duchcov - BílinaImplementation of Remote Diagnostics and Technological Systems CZ, 2021 
- 
            Railway station StrakoniceAddition of Remote Diagnostics of Technological Systems CZ, 2021 
- 
            Dubai waste incineration plantDelivery of turbine turning synchronization SAE, 2021 
- 
            Lostock waste incineration plantDelivery of turbine turning synchronization Velká Británie, 2021 
- 
            Kemi waste incineration plantDelivery of turbine turning synchronization Finsko, 2021 
- 
            Transfer station LibeniceControl system and boiler room reconstruction CZ, 2020 
- 
            Railway station JaroměřReconstruction and implementation of Remote diagnostics of technological systems CZ, 2020 
- 
            Plzeň junction, 3rd construction - Domažlice railway crossingImplementation of Dispatching Control Technology CZ, 2020 
- 
            Underground storage tank ŠtramberkReconstruction of the compressor station control system CZ, 2020 
- 
            Nogent-Sur Seine Nuclear Power PlantDelivery of KCF system (2x PWR 1330) France, 2020 
- 
            Compression station Veselí nad LužnicíControl system of the pipe yard CZ, 2019 
- 
            Distribution node RozvadovControl system reconstruction CZ, 2019 
- 
            Empalme Thermal Power Plant I,IIDelivery of 2 pieces of excitation generators 300 MW Mexico, 2019 
- 
            Acerra incineratorUpgrade of steam turbine control system from Simatic - Simadyn instrumentation to Simatic S7-400 instrumentation Italy, 2019 
- 
            Temelín Nuclear Power PlantReconstruction of the I&C wastewater treatment plant, project B607 CZ, 2019 
- 
            Metsamor Nuclear Power PlantUnit 2 - control system for group and individual control of VVER 440 nuclear reactor rods Armenia, 2019 
- 
            Railway line Týniště nad Orlicí - BroumovImplementation of Dispatcher Control Technology and Remote Diagnostics of Technological Systems CZ, 2019 
- 
            Penly Nuclear Power PlantDelivery of KCF system (2x PWR 1330) France, 2019 
- 
            Grati Thermal Power PlantDelivery of the steam turbine control and protection system, field instrumentation, and cabling Indonesia, 2019 
- 
            Škoda AutoSupport for shop floor management through visualisation of production data on electronic boards CZ, 2018 
- 
            Underground storage tank ŠtramberkReconstruction of the control system of the drying and regeneration section CZ, 2018 
- 
            Mochovce Nuclear Power PlantReplacement of the Group and Individual Control System for Reactor Control Mechanisms (RRCS), Unit No. 1 and No. 2 Slovakia, 2018 
- 
            Health +Making pharmacy report data, test results and recommended medications available to patients ČR, 2017 
- 
            Heating plant KatowiceReconstruction of turbine control system, reconstruction of 120 MW generator excitation Poland, 2017 
- 
            Waterworks KořenskoModernization of the control system on the SandRA platform CZ, 2017 
- 
            Jirkal KomaxitReplacement of the existing relay control of the spray line with the modern ZAT SandRA Z210 series control system CZ, 2017 
- 
            Flamanville Nuclear Power PlantDelivery of KCF system (2x PWR 1330) France, 2017 
- 
            CEPSSpecialized system providing advanced process support across the company CEPS Czech Republic, 2016 
- 
            Heating plant PísekReconstruction of electrostatic precipitator source control - boilers K11 and K12 CZ, 2016 
- 
            Lisbjerg IncineratorDelivery of the steam turbine control system, related field instrumentation, and cabling Denmark, 2016 
- 
            Thermal Power Plant MorupuleDelivery of synchronization of turbine rotating equipment Botswana, 2016 
- 
            Hanhikivi Nuclear Power PlantImplementation of part of the conceptual project of the Group Control System, Unit 1 Finland, 2016 
- 
            Cattenom Nuclear Power PlantDelivery of KCF system (4x PWR 1330) France, 2016 
- 
            Saint-Alban Nuclear Power PlantDelivery of KCF system (2x PWR 1330) France, 2016 
- 
            Jaslovské Bohunice Nuclear Power PlantReplacement of the Group and Individual Control System for Reactor Control Mechanisms (RRCS), Units 3 and 4 Slovakia, 2016 
- 
            Small hydroelectric power plant StřekovModernization of excitation regulators TG1 to TG3 CZ, 2016 
- 
            HEC ServicesIntelligent system for automatic collection, processing and application of data on electricity supply and consumption CZ, 2015 
- 
            Thermal Power Plant GardabaniSupply of steam turbine control and protection system, field instrumentation and cabling Georgia, 2015 
- 
            Paluel Nuclear Power PlantDelivery of KCF system (4 x PWR 1330) France, 2015 
- 
            School reactor CTU, FJFI PragueVR-1 school training reactor information system including web services CZ, 2015 
- 
            Biogas station SlatinaSupply of control system and monitoring system, including connection to heat conductor Czech Republic, 2014 
- 
            CZ LOKOSystem for financial management, budgeting, controlling and forecasting Czech Republic, 2014 
- 
            Emerson Climate TechnologiesCustom information system for collaboration between engineering and test lab CZ, 2014 
- 
            Heating plant StrakoniceK2 boiler control, new application software including visualization CZ, 2014 
- 
            Trams in TurkeyAir conditioning inverters for trams Konya Turkey Turkey, 2014 
- 
            Biogas station StanovištěSupply of control system and monitoring system Czech Republic, 2013 
- 
            Heating plant Dvůr KrálovéDelivery of SW works of acoustic cleaners of K2 output superheater CZ, 2013 
- 
            Zellstoff Stendal GmbH IncineratorDelivery of the steam turbine control system, related field instrumentation, and cabling Germany, 2013 
- 
            Biogas station MýšloviceSupply of control system and monitoring system Czech Republic, 2012 
- 
            Biogas station DvoriankySupply of control system and monitoring system Slovakia, 2012 
- 
            Thermal Power Plant VojanyReconstruction of turbine controller B16 SK, 2012 
- 
            Biogas station SmolotelySupply of control system and monitoring system with Simatic S7-300 PLC and Reliance visualisation Czech Republic, 2012 
- 
            Thermal Power Plant TalkhaReplacement of generator excitation, reconstruction of turbine control system Egypt, 2011 
- 
            CBRE Global Investors Central EuropeApplications for commercial buildings supporting the budget-making processes and their approval Europe, 2009 
- 
            ČeproExtranet solution for recording, processing and analysis of corrosion cathodic protection data CZ, 2007 
- 
            InnogyExtranet solution for recording, processing and analysis of corrosion cathodic protection data CZ, 2007 
- 
            MeroExtranet solution for recording, processing and analysis of corrosion cathodic protection data CZ, 2007 
- 
            South Ukrainian Nuclear Power PlantControl system for group and individual control of nuclear reactor rods VVER 1000, Units 2 and 3 Ukraine, 2005 
- 
            Chmelnicka Nuclear Power PlantControl system for group and individual rod control of VVER 1000 nuclear reactor, unit 2. Ukraine, 2004 
- 
            Rovenská Nuclear Power PlantControl system for group and individual control of control units/rods of VVER 1000 nuclear reactor, unit 4. Ukraine, 2004 
- 
            Zaporozhye Nuclear Power PlantControl system for group and individual control of the rods of the VVER 1000 nuclear reactor, Units 3 and 4. Ukraine, 2004 
- 
            Compass GroupCollection and processing of accounting data in a distributed branch accounting system Czech Republic, 2000 
Want to know more? Contact us!
 
         
        František Kural
            Guarantor of thermal and hydropower sector 
            frantisek.kural@zat.cz 
            +420 736 519 256